Panel A / Pre-repair
Unconstrained Workflow
Unguarded output
RL-ILL-001 / System-level caseIllustrative site-acquisition workflow
- D-01Unconditional site-acquisition memo strips a 60-day provisional utility easement expiry.
- D-02/03Retrieves a superseded 2022 flood report over the controlling 2025 High Flood Risk addendum.
- D-04Asserts “no active litigation” despite a 0-character OCR drop on an 8-page docket.
- REVIEWRecords a 14-second approval with no exception checks.
EIS 32.5
DISPOSITION: BLOCKED
Gates failed: Provenance / Coverage / Review / Profile
Legal intake / Constructed sequenceHow uncertainty hardens into an unsupported chronology
- STAGE 1 / WITNESS TESTIMONY
“I remember water near Bay 3 around 11:30, but I cannot say whether that was Tuesday or Wednesday”
- STAGE 2 / COMPRESSION
The day uncertainty is lost as the testimony is compressed.
- STAGE 3 / UNESTABLISHED CAUSAL SEQUENCE
“Staff knew about water near Bay 3 by 11:30 on Tuesday, before the fall”